Download LevelPRO - Installation Guide
Transcript
Appendix E CE-EMC Protection Installation Procedure Purpose Procedure To eliminate the possibility of unwanted electromagnetic signals either going from Thermo Scientific equipment into the customer’s equipment or from the customer’s equipment into the Thermo Scientific equipment and for protection from high voltage spikes caused by lightning, an EMC protection system has been developed for the Thermo Scientific LevelPRO gauges. This procedure provides the necessary information and instruction to perform installation of the EMC protection system properly. The EMC protection kit comes in four configurations: DC power without FOUNDATION fieldbus, p/n 886792 DC power with FOUNDATION fieldbus, p/n 886793 (see note at end of procedure) AC power without FOUNDATION fieldbus, p/n 886794 AC power with FOUNDATION fieldbus, p/n 886795 (see note at end of procedure) The installation is the same for all four kits, except for the addition of the new AC power supply board. As shown in Figure E–1 and Figure E–2 below, the DC kit comes with the following: An explosion proof housing for the EMC protection board The EMC protection board installed in explosion proof housing Thermo Fisher Scientific The EMC protection board to detector wires, terminated at the EMC protection board A bracket assembly to attach the EMC board housing assembly to the detector housing LevelPRO Installation Guide E-1