Download mec 20 microprocessor engine/ generator controller
Transcript
MEC 20 MICROPROCESSOR ENGINE/GENERATOR CONTROLLER function is only operative with an electrically-held type transfer switch mechanism (i.e. electrical contactor type). 9.3.5.3. UTILITY POWER RETURN: • Remote Start input signal is removed and the Return Delay timer is initiated (i.e. Utility Voltage returns to normal and the Utility voltage sensor contact opens) • Once the Return Delay timer expires, the Generator Ready to Load output de-energizes and the Neutral Delay timer is initiated. • Once the Neutral Delay timer expires the Utility Ready to Load output energizes to signal the transfer switch to transfer to the utility supply. Note: If the generator has a shutdown during the Return or Neutral Delay periods, the timers are bypassed, and the Utility Ready to Load output immediately energizes. • The generator Cooldown Timer starts timing following expiry of the Return Delay timer. • The generator stops following expiry of the Cooldown Timer. 9.3.5.4. MEC LOAD TEST PUSH-BUTTON OPERATION NOTE: The following sequence as described is applicable only if both “Utility Ready to Load” and Gen Ready to Load” outputs are programmed and used. • When the MEC Load Test pushbutton is pressed, the controller’s logic will internally simulate receiving a remote start input. • Engine starts following expiry of the Engine Start delay timer PM047 Rev 11 2002/09/09 53 Thomson Technology Inc.