Download User Guide - National Calculation Method
Transcript
7.4. Project Database form Each type of construction used in the building fabric is defined within the Project Database form. Within this form, there are five main tabs (circled in Figure 28): • Constructions for Walls tab • Constructions for Roofs tab • Constructions for Floors tab • Constructions for Doors tab • Glazing tab In each tab, you need to enter information on each of the different types of construction found in the building. For example, in your building, there may be two glazing types. This is where you enter the details of these types. Later on, during the building’s geometry definition, each of these construction/glazing types can be assigned to particular parts of the building envelope/door/window. In other words, you are not defining the walls, doors, or windows of your building at this stage; just the characteristics of the materials used in their construction. Clicking on the ”Check Objects assignment” button produces two reports: the Unassigned Objects Report and the Data Summary Report. These reports can be used to check the data entered at any stage of inputting a building into the interface. There is a “Reports” button on each tab within the interface so it is not necessary to return to this form to access the reports. How to double-check the data you have entered is explained at the end of this chapter (see Section 7.9: Double-checking the data). Notes: • Constructions for intermediate floors/ceilings are dealt with under the Constructions for Floors tab. • If the space in the roof is unconditioned, the top floor ceiling should be dealt with as a "roof". It should be given the combined thermal performance of the whole construction including the ceiling construction, the void, and the roof construction. • Only constructions for external doors and windows need to be defined in iSBEM (i.e., ignore internal doors and windows). 67 iSBEM version 3.5.a – UK Volume 4Jun10