Download Ultra3000 Integration Manual

Transcript
Commissioning Your Ultra3000
1-35
5. Observe the network status LED.
If the network status LED:
Then:
Flashes green
Establishing
communication with
network (wait for steady
green).
Illuminates steady green
Communication is ready.
Go to step 6.
Is not flashing or steady green
Go to the chapter
Troubleshooting Your
Ultra3000.
6. Observe the three SERCOS LEDs on the 1756-M08SE module.
If the three SERCOS LEDs:
Then:
Flash green and red
Establishing communication
(wait for steady green on all
three LEDs).
Illuminates steady green
Communication ready. Go to
Testing and Tuning Your Axes.
Go to the ControlLogix Motion
Module Setup and Configuration
Is not flashing or steady green Manual (publication
1756-UM006x-EN-P) for specific
instructions and troubleshooting.
Publication 2098-IN005A-EN-P — July 2001