Download ISS Certification Guide
Transcript
Interline Settlement System Appendix B Appendix B Questionnaire For Preliminary Testing 1. Railroad: 2. SCAC: 3. Approximate number of monthly interline movements: 500 or less 501 – 5000 More than 5000 4. Railinc Network ID (mailbox): (Password is not needed) 5. Dates of preliminary testing in ISSV 6. Have you conducted testing as defined in the preliminary testing matrix? Yes No 7. Have you successfully transmitted transactions to ISSV in the current ISS EDI version (426 transaction set)? Yes No 8. If no, state the number of 426 transactions that failed and the dates the messages were transmitted back to ISSV. Number of failed transactions: Date(s) of retransmission: 9. Number of 426 transactions sent: 10. What percentage passed syntax edits (EDI 997): % 11. Number of transactions received: 12. Have you successfully used ISSV to request (996 report requests) and receive an ISS report? If carrier responds with no, the assumption will be that this is not required by your road. Yes No Date of test: Revised January 2013 17