Download Installation and operation
Transcript
Figure 6.7. Cleaning of the boiler’s tube bundle and fire-grate. 1. Inlet for cleaning of the boiler’s tube bundle 2. Fire -grate The tube bundle cleaning has to be performed with steel brush, by carrying it through the top opening to the bottom of the tract. At the end, after the cleaning, the ash residues have to be scraped out from the boiler’s tube bundle bottom zone. Regular cleaning of the boiler’s heated surfaces ensures its reliable and economic operation, and conditions for long operation life cycle. 6.10. USER INTRODUCTION TO THE SERVICING AND ADJUSTMENT PROCEDURES OF THE BOILER. The user must be well introduced to: The appliance operation manual; How to operate the appliance; How to adjust and regulate the boiler; The methodic for servicing/handling of the boiler; How to clean the combustion and fuel chambers; How to clean the boiler’s tube bundle. 6.11. SAFETY AND UNPREDICTED RISKS. Risks related to the appliance usage: The combined wood gasification hot water boiler from series “3Fera” is designed and manufactured in compliance with the major safety European standards and directives. 3Fera 25/35/45 41