City of San Ramon
REQUEST FOR PROPOSALS
Traffic Signal Management System Upgrade: Bollinger Canyon Road and Crow Canyon Road (CIP 5457)
• if it meets requirements for further evaluation;
• if the City shall request clarification(s) or correction(s); or
• if the City shall determine the proposal non-responsive and reject it.
4.6.1. The Project Manager shall manage the proposal evaluation process and maintain
proposal evaluation records. A proposal evaluation team made up of City employees, and
others shall be responsible for evaluating proposals.
4.6.2. Oral presentations, written questions for further clarifications and/or site visits to
similar installations may be required.
4.6.3. The City reserves the right, at its sole discretion, to request clarifications of
proposals or to conduct discussions for the purpose of clarification with any or all
proposers. The purpose of any such discussions shall be to ensure full understanding of
the proposal. Discussions shall be limited to specific sections of the proposal identified
by the City and, if held, shall be after initial evaluation of proposals. If clarifications are
made as a result of such discussion, the proposer shall put such clarifications in writing.
4.6.4 Final Scoring
Proposers will be ranked based on the total points for the written proposal and
interview/demonstration. The highest scoring team will be recommended to enter into
negotiations with the City. If negotiations with the highest ranked firm fail to produce a
signed contract, the City will enter into discussions with the next highest scoring team.
4.7. Assignment and Subcontracting
4.7.1. The Proposer may not subcontract, transfer, or assign any portion of the contract
without prior, written approval from the City. Each subcontractor must be approved in
writing by the City. The substitution of one subcontractor for another may be made only
at the discretion of the City and with prior written approval from the City.
4.7.2. If awarded a contract under this RFP, the Proposer, notwithstanding the use of
approved subcontractors, shall be the Prime Vendor/Contractor and shall be responsible
for all work performed.
4.7.3. As part of response to this RFP, Proposer must delineate the responsibility of any
and all subcontractor(s) to be utilized for this project.
4.8. Right to Refuse Personnel
The City reserves the right to refuse, at its sole discretion, any subcontractors or any personnel
provided by the Prime Vendor/Contractor or its subcontractors for cause.
4.8.1. Joint Ventures and Partnering