Download Installation & Operating Instructions
Transcript
2. 2. For the installer For the installer 2.1 Scope of delivery, packaging 2.1.1 Boiler The boiler is supplied on a wooden pallet covered with a plastic sack – Fig. 3. The cladding parts are in a separate cardboard box. Cleaning tools are packed in the combustion chamber and the ash chamber. In addition, the pellet feed unit is packed in several cardboard boxes. 2.1.2 78 0 Optional accessories MES system control, motorised mixing valve, mixer groups, heating distributor, thermal discharge safeguard, stainless steel flue accessory, combi energy-saving intake regulator with explosion flap EEX (EZR for Germany) 1790 Accessories for boiler Accessories for fully-automatic pellet feed – Fully automated changeover unit with/without fire protection collars including 3x suction probes – Fully automated changeover unit with/without fire protection unit including 8x suction probes and masonry feed-through – Fastening clips for delivery hose (pack of 6) – Delivery hose with flexible earth leads, DN 50/25 m (supply and return air hoses) 97 5 – Connecting piece for return air hose Fig. 3 Installation dimensions – BioWIN XL Accessories for storage room – Filling coupling set NW 100 mm (2 Storz A couplings with 0.5 m pipe, incl. fastening material) – with blockable blind covers – Z-brackets (2x 2 m) incl. bolts and dowels for storage room door – Plastic baffle plate (1500 x 1500 x 2 mm) incl. fastening material for storage room – Fire protection collars (2x) incl. masonry attachment – Pipe clamp for earthing the filling and return air lines Ø 100 mm and attaching them to the wall – Pipes and bends (natural aluminium) for extending the filling and return air pipes Ø 100 mm. Pellet storage rooms – Sheet steel tank with volume of 2.3 to 9.6 – Fabric tank with volume of 2,1 to 6,1 t 6