Download project manual project plans and specifications public health
Transcript
SJCo Public Health Bio-Safety Level 3 Modular Laboratory Site Preparation Project Stockton, California CAST IN PLACE CONCRETE B. Deposit concrete continuously or in layers of such thickness that no concrete will be placed on concrete which has hardened sufficiently to cause the formation of seams or planes of weakness within the section. If a section cannot be placed continuously, provide construction joints as specified. Deposit concrete as nearly as practicable to its final location to avoid segregation due to rehandling or flowing, C. Placing Concrete in Forms: 1. Deposit concrete in forms in horizontal layers not deeper than 24" and in a manner to avoid inclined construction joints. Where placement consists of several layers, place each layer while preceding layer is still plastic to avoid cold joints. 2. Consolidate placed concrete by mechanical vibrating equipment supplemented by hand-spading, rodding or tamping. Use equipment and procedures for consolidation of concrete in accordance with the recommended practices of ACI 304, to suit the type of concrete and project conditions. 3. Do not use vibrators to transport concrete inside of forms. Insert and withdraw vibrators vertically at uniformly spaced locations not farther than the visible effectiveness of the machine. Place vibrators to rapidly penetrate the placed layer of concrete and at least 6" into the preceding layer. Do not insert vibrators into lower layers of concrete that have begun to set. At each insertion limit the duration of vibration to the time necessary to consolidate the concrete and complete embedment of reinforcement and other embedded items without causing segregation of the mix. D. Placing Concrete Slabs: 1. Deposit and consolidate concrete slabs in a continuous operation, within the limits of construction joints, until the placing of a panel or section is complete. 2. 3. 4. Consolidate concrete during placing operations so that concrete is thoroughly worked around reinforcement and other embedded items and into corners. Bring slab surfaces to the correct level with a straightedge and strikeoff. Use bull floats or darbies to smooth the surface, leaving it free of humps or hollows. Do not sprinkle water on the plastic concrete surface. Do not disturb the slab surfaces prior to beginning finished operations. Maintain reinforcing in the proper position during concrete placement operations by placing concrete chairs immediately prior to pour. Hooking reinforcing in position is not allowed. E. Cold Weather Placing: 1. Protect concrete work from physical damage or reduced strength which could be caused by frost, freezing actions, or low temperatures, in compliance with ACI 306. 2. Do not use calcium chloride, salt and other materials containing antifreeze agents or chemical accelerators, unless otherwise accepted in writing by the Owner Representative. F. Hot Weather Placing: 1. When hot weather conditions exist that would seriously impair the quality and strength of concrete, place concrete in compliance with ACI 305 and as herein specified. 2. Cool ingredients before mixing to maintain concrete temperature at time of placement below 90°F. CAST IN PLACE CONCRETE 03 30 00-8