Download project manual project plans and specifications public health
Transcript
SJCo Public Health Bio-Safety Level 3 Modular Laboratory Site Preparation Project Stockton, California SITE CLEARING SECTION 32 10 00 – SITE CLEARING PART 1 - GENERAL 1.5 SUMMARY: Remove site features and clear the site as shown on the Drawings and specified herein. 1.6 GENERAL REQUIREMENTS: This Section shall be performed in accordance with the General Conditions, Supplementary Conditions and all Sections in Division 1 of these Specifications. These documents must be read with the other Contract Documents and Sections as a whole to complete the intent of the contract. 1.7 SUBMITTALS: Make submittals to the Owner’s Representative in accordance with the provisions of Section 013323 of these specifications. 1.8 SECTION REQUIREMENTS: A. Traffic: Minimize interference with adjoining parking lot, walks, and other adjacent occupied or used facilities during site demolition and clearing operations. Provide safety devices such as cones, barricades, tape, etc. as required to safely divert vehicular and pedestrian traffic around the project area. B. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Owner's premises where indicated. C. Notify utility locator service for area where Project is located before site demolition and clearing. D. Do not begin demolition and site clearing operations until temporary erosion and sedimentation control measures are in place. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION 3.1 PREPARATION: A. Protect and maintain benchmarks and survey control points from disturbance. B. Provide temporary erosion and sedimentation control measures to prevent soil erosion and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways, in accordance with the erosion control plan and San Joaquin County Standards. SITE CLEARING 32 10 00-52