Download Inspect Design Document - MIT Space Systems Laboratory
Transcript
3 System-Level Budget Allocations (MC, JB) 3.1 Mass (JB, MK) Table 2: Mass Budget Allocation outlines the mass budget allocation of the INSPECT system, including the current best estimate (CBE) and margins of the subsystems. Note that the mass budget below does not include Halo and SPHERES masses, 4.525 kg and 4.828 kg, respectively (including batteries). In addition, masses in Table 2 do not include component wiring, which will reduce the total remaining mass when finalized. Table 2: Mass Budget Allocation Mass Budget Subsystems (components and structures and avionics) Allocated (kg) Allocated Less 10% Margin (kg) CBE (kg) Remainin g (kg) Remainin g (%) VERTIGO 2 1.8 1.732 0.068 3.78% Optical Rangefinder 2 1.8 0.828 0.972 54.00% Thermographic Camera 1 0.9 0.419 0.481 53.44% CMGs 6 5.4 5.1 0.3 5.56% Total Allocated Mass (kg) 11 Total Allocated Mass Less 10% Margin (kg) 9.9 Total CBE Mass (kg) 8.079 Total Remaining (kg, %) 1.82 18.39% 3.2 Power (JB) Table 3: Power Budget Allocation outlines the power budget allocation (in terms of average and peak power) of the INSPECT system, including the current best estimate (CBE) and margins of the subsystems. Table 3: Power Budget Allocation Power Budget Subsystems VERTIGO Optics Mount May 15, 2014 Allocated Peak Power (W) 5 Allocated Less 10% Margin (W) 4.5 CBE Avg Power (W) 1.4 Remaining (W) 3.1 (%) 68.89% 16.831 SPHERES INSPECT Design Document CBE Peak Power (W) 4.5 Remaining (W) (%) 0 0.00% 38