Download SunLink PV
Transcript
SunLink PV link to the sun surface. To avoid performance losses in series circuits, ensure that all modules have the same tilt and orientation. Your solar professional will be able to determine the best tilt angle for your location. ELECTRICAL INSTALLATION To ensure proper system operation and maintain the warranty, be careful to observe the correct cable connection polarity when connecting the modules to a battery or to other modules. If not connected correctly, the bypass diode(s) could be destroyed. All PV modules must be grounded by electrical connection of the module frames to ground. and locked Queens HONGKONG CO LTD Bypass Diodes The junction boxes used with Sunlink PV modules contain bypass diodes wired in parallel with the PV cell strings. In the case of partial shading, the diodes bypass the current generated by the non-shaded cells, thereby limiting module heating and performance losses. Bypass diodes are not overcurrent protection devices. Bypass diodes divert current from the cell strings in the event of partial shading. In the event of a known or suspected diode failure, installers or maintenance providers should contact the company the PV modules were purchased from. Never attempt to open the junction box of a PV module yourself. Care must be taken to arrange the system ground so that the removal of one module from the circuit will not interrupt the grounding of any of the other modules.In the event of a known or suspected diode failure, installers or Grounding maintenance providers should contact the company the PV modules were purchased from. Several different methods of grounding can be used to Never attempt to open the junction box of module provide the required connection through the frame yourself. anodizing. Before installation contact the local code Authority Having Voltages are additive when PV modules are connected directly in series, and module currents are additive when Jurisdiction to determine the proper grounding requirements. PV modules are connected directly in parallel. The frame of the PV module, as well as any exposed nonPV modules with different electrical characteristics must current-carrying metal parts of fixed equipment that are not be connected directly in series. able to become energized by the PV system, must be connected to the equipment grounding conductor in order The use of suitable third-party electronic devices to prevent electrical shock. connected to PV modules may enable different electrical Even when applicable regulations, code requirements, connections and must be installed according to the and standards do not require safety-related grounding, Sunlink PV recommends grounding all PV module frames in order to ensure the voltage between electrically Connectors conductive equipment and earth ground is zero in all circumstances Keep connectors dry and clean, and ensure that Although the modules are certified to safety class , we connector caps are hand tight before connecting the still recommend earthing them. modules. Do not attempt making an electrical connection with wet, The earth connection should be made by a qualified electrician. soiled, or otherwise faulty connectors. All the crunodes on the conductive connection must be Avoid sunlight exposure and water immersion of the fixed. The fastness does not depend on soldering. The connectors. metal containing iron in the conductive connection should Avoid connectors resting on the ground or roof surface. Faulty connections can result in arcs and electrical shock. be handled by some way, such as anodization, sprayCheck that all electrical connections are securely fastened. painting, galvanization. Stainless steel does not need to be handled. manufacturer’s specified instructions. Make sure that all locking connectors are fully engaged queens rev III/2014 8 of 1 2