5.2.4
Commissioning of the Power Section
The commissioning of the inverter’s power section is executed according to the
following sequence:
2.
Check the correct polarity of all PV inputs with a multimeter.
3.
Turn the system on by setting the two-position switch to "Start" position [Figure
5.3-2]. During normal operation the signal lamp [Figure 5.3-5] glows green and a
humming from the inverter can be heard. If the light is red or if it is flashing red,
see Chapter 8 for error handling.
4.
The Inverter is now ready for the set up of external control.
o
m
Turn the PV modules on by using the string box main switches.
Operation
.
c
5.3
1.
Turning the Inverter On
m
5.3.1
u
Turning the inverter on must be performed according to the following sequence:
Set the two-position switch [Figure 5.3-2] to "Stop" position.
2.
Turn the PV modules on by using the string box main switches.
3.
Turn the grid connection and the auxiliary power supply (transformer) on.
4.
Turn the main switch on [Figure 5.3-3].
5.
Wait until the touch screen panel [Figure 5.3-4] displays the WOODWARD IDS
logo.
6.
If the signal lamp is flashing/glowing red an error has occurred (see Chapter 8).
7.
Set the two-position switch [Figure 5.3-2] to "Start" position. After a successful
start up of the inverter the signal lamp [Figure 5.3-5] glows green and a humming
from the inverter can be heard. If the signal lamp is glowing or blinking red, there
is an error or a warning (see Chapter 8).
o
v
o
l
t
a
i
k
f
o
r
1.
If the signal lamp is off, this may be due to a defective light. The inverter could still be
in operation and under voltage.