M&V Plan
The New York Hilton
On-Site Support
The system being furnished by SET Environmental is web based and will be accessible to remote
users through the owner’s secured connection, with a static IP address and will be password
protected with multiple levels of access available. SET’s programmers, engineers and
technicians will have access to multiple levels of the system for remote support.
The site will be responsible for providing access to all areas necessary for verification of sensors.
3. Data Analysis
The collected data will be used to determine the net power output of the system as well as the
fuel conversion efficiency (FCE).
Table 2. Summary of Monitored Data Points
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Data Point
WG12
WG345
WG6
WG7
WPAR1
WPAR2
FG
QHUW
FL
TLS
TLR1
QHD
TLR2
FS
TFW
QHUS
WT
TAO
Description
Generator #1 & #2 Electrical Output
Generator #3, #4, & #5 Electrical Output
Generator #6 Electrical Output
Generator #7 Electrical Output
Parasitic Load Electrical Consumption ‐ Panel PPH
Parasitic Load Electrical Consumption ‐ Panel MP1
Combined Generator Fuel Input
Hot Water Heat Recovery (Calculated)
Glycol Main HR Loop Flow Rate Glycol Loop Supply Temperature Glycol Loop Return Temperature (downstream of loads)
Dumped Heat (Calculated)
Glycol Loop Return Temperature (downstream of Dry Cooler)
HRSG Steam Flow Meter Feedwater to Steam Generator Temperature
Steam Heat Recovery (Calculated)
Total Facility Energy / Power
Ambient Temperature CDH Energy Corp.
7
Units
kW/kWh
kW/kWh
kW/kWh
kW/kWh
kW/kWh
kW/kWh
CFH/CF
Btu/h / Btu
GPM
deg F
deg F
Btu/h / Btu
deg F
lbs./h
deg F
Btu/h / Btu
kW/kWh
deg F
November 2012