Download DoRIS User manual

Transcript
Step 10 – Screenshot 1
2.9.11 Submit programme proposal
Step 11 is the last step before submitting the programme proposal to the Focal Point or to the FMO
if the programme operator is directly contracted by the FMO.
There is an automatic validation in the system, but it is still very important that you check that all
information is provided in accordance to the Regulation and the agreed parameters set in the
relevant MoU(s). You can preview the inserted information in a pdf file. Please save this pdf file for
your record. If you are satisfied with the programme proposal click “Submit”
Step 11 – screenshot 1
3
What happens next?
In most cases the programme proposal will be submitted to the National Focal Point for their review.
The Focal Point can return the programme proposal to the programme operator in case there are
deficiencies or mistakes in the programme proposal and request that it is resent.
13