Download EurotestCOMBO - Alert Electrical
Transcript
MI 3125B EurotestCOMBO Data handling The memory structure is organized in a way that is suited to BS 7671 and other verification documents (Electrical Installation Certificate, Periodic Inspection Report etc.). If the results are stored in appropriate memory locations an automatic creation of a certificate/ report is possible. Display organization The installation structure field describes the location of the measurement (which object, bord, circuit). In the measurement field there is information about type and number of measurements that belong to the selected structure element (object and block and fuse). The main advantages of this system are: Test results can be organized and grouped in a structured manner that reflects the structure of the electrical installation. Customized names of data structure elements can be uploaded from EurolinkPRO PCSW. Simple browsing through the structure and results. Test certificates/ reports can be created with no or little modifications after downloading results to a PC. Figure 6.2: Installation structure and measurement fields Installation structure elements Memory operation menu Data structure field 1st level: OBJECT: Default location name (object and its successive number). nd 2 level: D.BOARD: Default location name (distribution board and its successive number). rd 3 level: CIRCUIT: Default location name (circuit and its successive number). ELECTRODE: Default location name (earth electrode). BONDING xxx: Default location names (7 bonding connections). No. of measurements in selected location [No. of measurements in selected location and its sublocations] 51