Download User Manual - e-catalog

Transcript
… The BAT-F X2 (FCC) types are installed with a housing cover - as
mounted in the state on delivery.
Special conditions for safe use
… Provisions shall be made to prevent the rated voltage from being
exceeded by transient disturbances of more than 40 %.
… When the temperature under rated conditions exceeds 70 °C at the
cable or conduit entry point, or 80 °C at the branching point of the
conductors, the temperature specification of the selected cable shall
be in compliance with the actual measured temperature values.
„ Lightning protection
When you mount devices and / or antennas outdoors, there is a risk of
them being struck by lightning. Additionally, there is the risk of voltage
surges being transmitted into the interior of the building. It is your
responsibility to take appropriate measures to mitigate the effects of
lightning strikes. Make sure the equipment is installed by a licensed
electrician in accordance with local, regional and national regulations for
codes and standards (such as VDE 0182 and IEC 62305) and according
to best practices for your application and environment.
Warning
When you mount devices outside buildings, there is a risk of
them being struck by lightning. Additionally, there is the danger
of voltage strikes being transmitted into the interior of the
building.
… See the information in the “WLAN Outdoor Guide”, chapter “Lightning
and Surge Voltage Protection”.
… Make sure that your plant designer or installer has carried out suitable
lightning prevention measures.
„ Qualification requirements for personnel
Qualified personnel as understood in this manual and the warning signs,
are persons who are familiar with the setup, assembly, startup, and
operation of this product and are appropriately qualified for their job. This
includes, for example, those persons who have been:
X trained or directed or authorized to switch on and off, to ground and to
label power circuits and devices or systems in accordance with current
safety engineering standards;
8
BAT Family
Release 03 08/10