Download installation manual - Bosch Security Systems

Transcript
INSTALLATION MANUAL
Operating Unit BE 500
Alarm
Fire
Fire
External Alarm
Internal Alarm
Message
BOSCH Safety Technology
Malfunction
System
Next Type
Next
Next
of Message
Message
Detector
Verification
time
Code
Action
Transmission unit
Sounder/Strobe
Power supply
Operation
Code operation
Day operation
Maintenance
Switch off
Internal Buzzer
Reset
0 1
2
Control
Transmission unit
0
Sounder/Strobe
Day--Night
System
on/off
Zone-Detector
ABC
Sounder/
Strobe
Control
Maintenance
Switch off
Transmission unit
Reset--
Addit.
function
Transmission
unit
Extinguishing
system
Switching
point
Seite 1
Siren
1
2
DEF
4
JKL
5
MNO
7
STU
3
GHI
6
PQR
8
VWX
CE
9
YZ
0
enter
stop
yes
--/:
no
BDL--4998100589
A1.en/ 06.12.2000
ST--FIR/ PRM1 / deh
Installation manual
Operating unit BE 500
Summary
1.
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3
1.1.
1.2.
1.3.
Installation notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Installation instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3
3
4
2.
Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10
2.1.
2.2.
2.3.
Connections on PCB BAB 10 . . . . . . . . . . . . . . . . . . . . . . . . . . .
Description of terminals on the BAB 10 . . . . . . . . . . . . . . . . . . .
Connection of BE 500 to the BZ 500 LSN . . . . . . . . . . . . . . . . .
10
11
12
3.
Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13
3.1.
3.2.
3.3.
Configuration via BZ 500 LSN . . . . . . . . . . . . . . . . . . . . . . . . . .
Configuration via OVS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Configuration notes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
13
14
14
4.
Commissioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
15
4.1.
Overview of menu structure and operating functions . . . . . . .
16
5.
Notes on maintenance and service . . . . . . . . . . . . .
17
5.1.
5.2.
Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Replacement and disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17
17
6.
Technical data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
6.1.
6.2.
6.3.
6.4.
6.5.
6.6.
Standards and regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Dimensions/Weight/Colour . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Environmental conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Serial interfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Display time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Power supply . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
18
18
18
18
19
6.6.1.
230 V -- Mains . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
6.6.2.
Power supply from the BZ 500 LSN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
19
6.7.
Maximum cable length between BZ 500 LSN and BE 500 . .
19
6.7.1.
For power supply from the BZ 500 LSN (0V, 12V) . . . . . . . . . . . . . . . . . .
19
6.7.2.
For power supply by the internal power supply unit (230 V) . . . . . . . . . .
19
7.
Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20
8.
Notices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21
page 2
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
1.
Operating unit BE 500
Installation
1.1. Installation notes
D Only install the equipment in dry, attended interior rooms.
Ambient conditions should be taken into account (see page 18).
D Operating control and display elements must be positioned at eye level.
D Only use the installation material recommended by UC--ST, otherwise it will
not be possible to guarantee against interference.
D Do not operate devices which have condensation on them.
D Push a ferrite sleeve on the NYM 3x1.5 power cable (230 V).
D Clip a flap ferrite onto the data cable.
D Observe the usual precautionary measures for CMOS technology when
handling printed circuit boards.
D Caution ESD (electrostatic discharge)
Ensure that the usual measures and instructions with regard to
electrostatic discharge are observed.
D Observe any electrical connection conditions currently enforced by local
authorities (fire service).
D If a BAT 100 LSN remote display panel is mounted in addition to the
BE 500 as an LED individual display detector group, it should be fitted
casing to casing with the BE 500.
1.2. Dimensions
270
Alarm
75
Fire
Fire
Message
External Alarm Internal Alarm
BOSCH Safety Technology
Malfunction
System
Next Type
of Message
Next
Message
Next
Detector
Verification
time
Code
Reset-System
Switch off
Zone-Detector
ABC
Sounder/
Strobe
JKL
Transmission
unit
STU
Action
Transmission unit
Power supply
Operation
Code operation
Day operation
Maintenance
Control
Transmission unit
Switch off
Transmission unit
Sounder/Strobe
Internal Buzzer
01
2
0
Reset
Control
Day--Night
on/off
1
4
Maintenance Extinguishing
system
Addit.
function
Switching
point
7
2
DEF
Siren
3
GHI
5
6
MNO PQR
8
VWX YZ
CE 0
270
Sounder/Strobe
9
enter
--/:
no
page 3
stop
yes
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
1.3. Installation instructions
Mark the position of the boreholes (3)
using the drilling template provided.
The upper edge of the drilling
template should be
approximately 170 cm above
the ground.
50mm
Drill 3 dowel holes (∅ 6 mm) at least
50 mm deep, and insert the
dowels (S6).
∅ 6 mm
4mm
Screw in the upper screw
(5x50 half--round) until approximately
4 mm of the screw are left visible.
5x50
half--round
Alarm
Malfunction
System
Fire
External Alarm
Fire
Internal Alarm
Message
Next Type
of Message
Next
Message
Verification
time
Code
Reset-System
Next
Detector
Day--Night
on/off
Siren
Switch off
Zone-Detector
1
ABC
2
DEF
3
GHI
Action
Transmission unit
Sounder/Strobe
Power supply
Operation
Undo the screw (A) on the BE 500 and
remove the casing cover.
The cover is suspended from the top,
and must be raised from the bottom by
approximately 10 mm before it can be
removed.
Code operation
Day operation
Maintenance
Internal Buzzer
0
1
2
Control
Transmission unit
0
Reset
Sounder/
Strobe
4
JKL
5
MNO
Control
Transmission
unit
7
STU
8
VWX
Maintenance
Extinguishing
system
CE
Switch off
Transmission unit
Sounder/Strobe
Addit.
function
Switching
point
6
PQR
9
YZ
0
enter
stop
yes
- /:
no
A
2.
1.
Continued
overleaf
approx. 10mm
page 4
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
Cable entries
Data cable
Mains cable
Introduce the cable into the back
of the BE 500 and fix the casing
to the upper screw.
Line up the casing and screw in
the two lower screws.
Recommended screws:
5 x 50 half--round
Pull the operating panel forwards
and push into the parking
position.
Tighten the upper screw.
Continued
overleaf
page 5
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
Pull the operating panel out of the
parking position and push it back
into the casing.
Caution, ESD, (electrostatic discharge)
Ensure that the usual measures
and instructions with regard to
electrostatic discharge are
observed.
Isolating jumper
OUT IN
(POWER)
DOWNLOAD
1 2 3
14FB14
19FB19
23FB23
6 FB6
7 FB7
1 FB1
2 FB2
4 FB4
ON BE
Remove system voltage isolating
jumper from the connections
board.
8 FB8
9 FB9
12FB12
-- +
10V...15V
SDO-SDO+
SDI-SDI+
CTS
OV3
Input
Power supply:
The power is supplied either from
the BZ 500 LSN (0V,12V) or from the
BAB 10 internal power supply unit.
Continued
overleaf
page 6
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
Power supply from the internal
230V-- power supply unit
Check that the 230V mains cable is off
circuit before carrying out further work.
Fix the ferrite sleeve
to the mounting using
a cable tie.
Mains voltage should be protected as a
separate power circuit using an M 10A
fuse.
Push a ferrite sleeve onto the mains
cable and fix it to the BE 500 casing
mounting using a cable tie.
Cable passage for the
NYM 3x1.5 mains cable
Unlocking lever
Connect the mains cable to the 230V
terminal on the BAB 10 connections
board.
Do this by pressing the unlocking lever
back with a screwdriver and inserting
the conductor from the front.
SINE
T 500
MAINS
230 V
Input
Also connect the protected earth
(Class of protection I).
L1
N
Power supply from the BZ 500:
Observe the maximum cable length
between the BZ 500 LSN and the
BE 500. See table, page 19
Continued
CTS
OV3
1 2 3
14FB14
19FB19
23FB23
ON BE
OUT IN
(POWER)
DOWN LOAD
6 FB6
7 FB7
1 FB1
2 FB2
4 FB4
In the case of power supply from the BZ
500 LSN (0V, 12V), the cables should be
connected to the -- / + input.
8 FB8
9 FB9
12FB12
-- +
10V...15V
SDO-SDO+
SDI-SDI+
Input
overleaf
page 7
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
Strip the data cable and fix it to the
mountings using cable ties for strain
relief.
Clip a flap ferrite onto the data cable.
Solder on the connector and plug it in.
Connect the shielding the wire.
(see also chapter 2, Connections)
Data cable passage
Cable tie
mountings
Shielding wire
terminal
SINE
T 500
MAINS
230 V
Input
With a 230V power supply:
Screw in the mains fuse (SINE T500).
L1
N
Isolating jumper
CTS
OV3
1 2 3
14FB14
19FB19
23FB23
ON BE
6 FB6
7 FB7
1 FB1
2 FB2
4 FB4
Continued
OUT IN
(POWER)
DOWN LOAD
8 FB8
9 FB9
12FB12
-- +
10V...15V
SDO-SDO+
SDI-SDI+
Input
With a 230V power supply:
Screw in the SINE T 500 (mains fuse).
Fit the system voltage (and current
measurement) isolating jumper
(POWER).
overleaf
page 8
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
Configure the BE 500:
(see chapter 3, page 13)
1.
Check all the BE 500 functions:
(see chapter 4, page 15)
First slide the cover onto the upper
edge of the casing, and then swing it
down into the casing.
2.
Alarm
Malfunction
System
Fire
External Alarm
Fire
Internal Alarm
Message
Next Type
of Message
Next
Message
Verification
time
Code
Reset-System
Next
Detector
Day--Night
on/off
Siren
Switch off
Zone-Detector
1
ABC
2
DEF
3
GHI
Reset
Sounder/
Strobe
4
JKL
5
MNO
6
PQR
Control
Transmission
unit
7
STU
8
VWX
Maintenance
Extinguishing
system
CE
Action
Transmission unit
Sounder/Strobe
Power supply
Tighten the screw (A) and seal it using
a lead seal.
Operation
Code operation
Day operation
Maintenance
Internal Buzzer
0
1
2
Control
Transmission unit
0
Switch off
Transmission unit
Addit.
function
Sounder/Strobe
9
YZ
0
enter
stop
yes
- /:
no
Switching
point
A
Alarm
Malfunction
System
Fire
External Alarm
Fire
Internal Alarm
Message
Next Type
of Message
Next
Message
Verification
time
Code
Reset-System
Next
Detector
Day--Night
on/off
Siren
Switch off
Zone-Detector
1
ABC
2
DEF
3
GHI
Reset
Sounder/
Strobe
4
JKL
5
MNO
6
PQR
Control
Transmission
unit
7
STU
8
VWX
Maintenance
Extinguishing
system
CE
Action
Transmission unit
Sounder/Strobe
Power supply
Operation
Code operation
Two additional securing screws must
be screwed into the base of the cover
on VdS systems
Day operation
Maintenance
Internal Buzzer
0
1
2
Control
Transmission unit
0
Switch off
Transmission unit
Sounder/Strobe
Addit.
function
9
YZ
0
enter
stop
yes
- /:
no
Switching
point
Securing
screws
page 9
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
2.
Operating unit BE 500
Connections
2.1. Connection PCB BAB 10
Power supply from the BZ 500 LSN (input voltage 10.2 --14.8 V)
Isolating jumper for system voltage and current measurement
20mA serial interface for BZ 500 LSN connection
For optocoupler V.24 interface (OVS) configuration
Ribbon cable connections to the BEB 10
CTR
+
SINE
T 500
ST1
OUT IN
(POWER)
14FB14
19FB19
23FB23
DOWNLOAD
1 2 3
1 FB1
2 FB2
4 FB4
6 FB6
7 FB7
8 FB8
9 FB9
12FB12
ON BE
10V...15V
SDO-SDO+
SDI-SDI+
CTS
OV3
Input
--
ST2
E10 E4
E11 E5
E12 E6
OV2 OV1
X2
X1
MAINS
L1
Fire department
Key switch input
control panel (FBF)
connection
Jumper on ON, if a new program
is being loaded from the
BZ 500 LSN
(not during configuration).
N
Mains fuse
230 V
power
supply
Caution
SINE
T 500
MAINS
L1
N
Caution, high--voltage
The capacitor bonding on the
BAB 10 connections board must
not be removed.
page 10
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
2.2. Description of terminals on the BAB 10
In (I)
Out(O)
Terminal
Function
Fire department control panel FBF
FB 23
I
for FBF: switch off the ÜE button
FB 19
I
for FBF: trigger (check) the ÜE button
FB 14
I
Voltage supply +12V
FB 12
O
for FBF: ÜE triggered display
FB 9
O
for FBF: Alarm generator display
switched off
FB 8
O
for FBF: reset control unit display
FB 7
O
for FBF: ÜE display switched off
FB 6
I
for FBF: Buzzer off button
FB 4
I
for FBF: Alarm generator off button
FB 2
I
for FBF: Control unit reset button
FB 1
I
0V voltage supply
Key switches
E4, E5, E6, OV2, X1
I
Key switch 2
E10, E11, E12, OV1, X2
I
Key switch 1
Mains
L1
I
Phase
N
I
Neutral conductor
I
Protected earth
page 11
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
2.3. Connection of BE 500 to the BZ 500 LSN
BZ 500 LSN
BE 500
BAB 10
COM 1 to COM 3
ANNE 10
RXD
0V
TXD
+
DIR
SM 20
20mA interface
SDI+
green
SDO--
SDI--
grey
SDO+
SDO+
yellow
SDI--
SDO--
white
SDI+
-U--EXT 1
+
-U1
+
Connect the shielding
wire on both sides.
Installation cable: J--Y(St)Y
1
Only connect U--EXT if the
BE 500 is being supplied with
power from the BZ 500 LSN.
page 12
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
3.
Operating unit BE 500
Configuration
3.1. Configuration via BZ 500 LSN
BE 500 configuration must take place via OVS if the BE 500 is connected to the
BZ 500 LSN COM 1 interface (see overleaf).
Configuration can be carried out directly via the BZ 500 LSN (or via OVS) if
the BE 500 is connected to COM 2 and COM 3.
The interface expansion unit, ERSE 10, must be installed in the
BZ 500 LSN for the COM 2 and COM 3 interfaces.
Before the PC/laptop is connected to the PC terminal, any SM 20 interface
module which may be connected to the BZ 500 LSNs’ COM 1 interface must
be removed.
Deenergize the BZ 500 LSN before any action.
BZ 500 LSN
ANNE 10
page 13
COM2
COM3
SM20 slot
SM20 slot
COM1
SM20 slot
(with ERSE)
(with ERSE)
(ZALE)
PC port
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
3.2. Configuration via OVS
If there is no ERSE fitted, the BE 500 must be configured
via OVS (optocoupler V.24 interface), independently of the
BZ 500.
BE 500
OVS
BAB 10
20mA
CTR
OPTO
SDO--
1
SDO+
6
SDI--
5
SDI+
9
CTS
V.24
PC used for
configuration
OPTO
OPTO
OV3
4
5
9
2
3
8
7
1
6
Notes:
D Jumper assignment: Set OVS jumpers BR1 and BR2 to 1/2.
D The numbers correspond to SUB--D (9--pin) connector pin assignment.
3.3. Configuration notes
The BE 500 is configured from a PC or laptop using the configuration
program Win PARA. A PC or laptop with at least 4 MB RAM, and Windows
version 3.1 or later is required for this.
Configuration steps:
1. Call up the configuration data for the BZ 500 LSN from the >WinPARA>
program.
2. Call up the CONTROL PANEL menu.
3. Enter BE 500.
4. Enter any key switches and set their configuration data.
5. Assign interfaces to the BE 500 as follows:
-- Interfaces
-- Central interface
-- Interface 1
-- ERSE interface expansion
-- Interface 2
-- Interface 3
Call up “Interfaces 1 to 3” and enter the BE 500 control panel under
“device connected”.
6. Load the configuration data to the system (BZ 500 LSN) or to the
individual BE 500.
7. It is essential to backup the data after successful configuration.
(from the BZ 500 LSN disk).
page 14
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
4.
Operating unit BE 500
Commissioning
The cables have been disconnected.
A connection is established between
the BZ 500 LSN and the BE 500.
see chapter 2 “Connections”
Switch on the voltage supply to the
BE 500.
NO
The green “Operation
LED” lights up
Analyse and
remedy
malfunctions.
YES
Configure the BE 500 via the
BZ 500 LSN.
see chapter 3 “Configuration”
Reset (confirm) messages on the
BZ 500 LSN.
Carry out the test:
Check the operating functions.
Fit the casing cover, screw on the
casing and seal the screws.
The BE 500 is operational.
page 15
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
4.1. Overview of menu structure and operating functions
User code input
Reset
Switch off
Control
Maintenance
Next Functions
Detector
groups
Detectors/
detector
groups
Control
zones
Detectors/
detector
groups
Display alarm
counter status
Control
zones
Control
zones
Switching
points
ÜE
(transmission
equipment)
Extinguishing
zones
Alarm
generator
Switching
points
Switching
points
Alarm
generator
Alarm
generator
ÜE
(transmission
equipment)
Extinguishing
zones
Control
zones
ÜE
(transmission
equipment)
Change operator
code
Backup memory
Jump to a
date/an event
Earth fault
Alarm
generator
Select/search for
events
Print events out
Test the displays
Central unit
functions
malfunction
Enter the
date/time
Block
detectors/detect
or groups
Display software
status
. See also the BZ 500 LSN / BE 500 user manual
page 16
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
5.
Operating unit BE 500
Notes on maintenance and service
Maintenance and inspection procedures must be carried out by appropriately
qualified staff at the intervals specified.
VDE 0833 specifications are additionally valid for all work of this kind.
System power measuring points
The system current can be measured on the BAB 10 connections board.
Remove the jumper (POWER) fitted in the factory and connect a current
measuring device to the two Stoko pins.
Isolating jumper for system voltage and current measurement
SDO-SDO+
SDI-SDI+
-- +
(POWER)
OUT IN
T 500
ST1
DOWNLOAD
1 2 3
E10
E11
E12
OV2
X2
14FB14
19FB19
23FB23
8 FB8
9 FB9
12FB12
6 FB6
7 FB7
1 FB1
2 FB2
4 FB4
ON BE
10V...15V
CTS
OV3
Input
ST2
E4
E5
E6
SINE
OV1
X1
5.1. Documents
Item number
LE*
Designation
3.002.219.470
1
BZ 500 LSN / BE 500 operating instructions
3.002.218.156
1
AHB EMZ / fire detection system control unit
connection manual
* LE = Delivery item
For those with access authorization, on the Bosch ST ExtraNet at
www.boschsecurity.com/emea/fire
the current information for each product, as well as the installation
instructions supplied with the device, are available for download as
a PDF file.
5.2. Replacement and disposal
Printed boards and batteries which are faulty and can no longer be
repaired must be disposed of correctly.
page 17
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
6.
Operating unit BE 500
Technical data
6.1. Standards and regulations
The BE 500 complies with the relevant European regulations and codes
of practice for alarm receiving stations (GMA).
--------
VdS (certification number: G 298054)
EN 54
ISO
DIN 14675
VDE 0833
EMC Directive 89/336/EEC
Austrian standard
6.2. Dimensions/Weight/Colour
Dimensions (h x w x d): 270 x 270 x 75 mm
Weight: approx. 2.3 kg
Colour of casing: light grey
Colour of cover: light grey
Colour of control panel: white grey
6.3. Environmental conditions
Environmental protection class II (EN 54/2)
Degree of protection IP 30 (EN 60529/DIN VDE 0470, part 1)
Class of protection I (EN 60950/DIN VDE 0106, part 1)
EMC noise emission, EN 50081--1
EMC noise immunity, EN 50130--4
Ambient temperature 268 K ... 318 K (--5°C ... +45°C)
Storage temperature 253 K ... 333 K (--20°C ... +60°C)
6.4. Serial interfaces
Interface: 20 mA (optocoupler interface)
Transmission speed:
-- with ZALE 10 (BZ 500 LSN): 9600 bit/s
-- with ERSE 10 (BZ 500 LSN): 19200 bit/s
Installation cable: J--Y (ST) Y 2 x 2 x 0.6
6.5. Display time
Malfunction signal display time: 1 hour (buzzer)
page 18
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
6.6. Power supply
6.6.1. 230 V mains
Mains voltage: 230 V~ (--15% ... +10%)
Mains connection cable: NYM 3 x 1.5 mm2
Mains frequency: 50 Hz
Mains voltage fuse protection: M 10 A
Mains fuse (SINE): T 500
Primary transformer (230 V): 14 V/ 0.5 A
Power consumption: 5 W (230 V), full system
Protection class: I
6.6.2. Power supply from the BZ 500 LSN
Input voltage UExtern 10.2 V ... 14.8 V
Power consumption with an input voltage of UExtern 14.8 V
Off--load current without FBF
65 mA
Off--load current with FBF
75 mA
Alarm power (including display lighting)
120 mA
Alarm power (including display lighting and FBF)
140 mA
6.7. Maximum cable length between BZ 500 LSN and BE 500
6.7.1. For power supply from the BZ 500 LSN (0V, 12V)
BZ 500 output voltage: UBZ = 10.8 V (min.)
BE 500 input voltage: UBE = 10.2 V (min.)
permissible voltage drop
≤ 0.6 V
Conductor diameter /
conductor
cross--section
Maximum cable
length without FBF
Maximum cable
length with FBF
0.6 mm ∅
approximately 20 m
approximately 15 m
0.8 mm ∅
approximately 30 m
approximately 25 m
1.0 mm2
approximately 50 m
approximately 35 m
1.4 mm 2
approximately 100 m
approximately 70 m
Cable resistance: 2 x RL/2 < 1,5 Ω
6.7.2. For power supply from the internal power supply unit (230 V)
Maximum cable length: 1,000 m
page 19
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
7.
Operating unit BE 500
Abbreviations
AHB
= Connection handbook (Anschaltehandbuch)
ANNE
= Connection PSU unit (Anschaltung--Netzgerät--Einheit)
BAB 10
= Operating panel connection
(Bedienfeld--Anschaltung--BZ)
BAT 100
= Operating and display panel
(Bedien-- und Anzeigeteil Tableau
BE 500
= Operating unit (Bedieneinheit)
BEB 10
= Operating panel electronic (Bedienfeld--Elektronik--BZ)
BMZ
= Central fire detection panel (Brandmeldezentrale)
DIN
= German institute for standardization
(Deutsches Institut für Normung e.V.)
EMV
= Electromagnetic compatability
(Elektromagnetische Verträglichkeit)
EN
= European Standard (Europa Norm)
ERSE
= Interface expansion unit
(Erweiterung--Schnittstellen--Einheit)
FBF
= Fire department control panel (Feuerwehrbedienfeld
GMA
= Security system panel (Gefahrenmeldeanlage)
ISO
= International Organisation for Standardization
LED
= Light emitting diode (Leuchtdiode)
LSN
= Local security network (Lokales Sicherheits Netzwerk)
OVS
= V.24 interface (Optokoppler V.24 Schnittstelle)
PI
= Product information (Produktinformation)
SM
= Interface modules (Schnittstellenmodul)
ÜE
= Transmission unit (Übertragungseinrichtung)
uP
= Flush mounting (unter Putz)
VDE
= Association of German Electrical Engineers
(Verband Deutscher Elektrotechniker e.V.)
VdS
= German Association of Property Insurers
(Verband der Schadenversicherer
Schadenverhütung GmbH)
ZALE
= Control unit display LSN unit
(Zentrale--Anzeige--LSN--Einheit
page 20
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
8.
Operating unit BE 500
Notices
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
page 21
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
_____________________________________________________________
page 22
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Installation manual
Operating unit BE 500
page 23
BDL--4998100589
A1.en / 06.12.2000
ST--FIR/ PRM1/ deh
Bosch Security Systems
Robert--Koch--Str. 100
D--85521 Ottobrunn
Info--Service
Telephone: +49 89 6290 -- 1039
Fax:
+49 89 6290 -- 1039
www.boschsecurity.com
[email protected]
Page 24 of 24