Assigning Resources To Activities
Assignments link a resource and all its data to a task or tasks within the schedule. Because the
Schedule View and the Resource View draw from two different pools of information, assignments act
• Make resource assignments
within the Schedule View
as a bridge between the two information databases. Until you assign a resource to a task within the
• Assign resources by selecting
schedule, the Schedule View and the Resource View cannot interact.
them from a drop-down list of
Resource assignments are made within the Schedule View. Simply type resource names in the
predefined resources
Assigned Resources column or double-click on the bar you would like to assign a resource to and
open the Information form. The Assignments table displays a list of resources currently assigned to
• Display and edit percent effort,
that activity. You may add a new resource to that bar by clicking the Select Resource drop-down list
per use cost, standard and over
in the Resource Name column. From the list you can select from existing resources or choose Create
time rates in the Assignments
Resource to open the Resource Information dialog and create a new resource.
tab
Editing the rate information in the Assignments tab affects only that particular assignment. You can
also enter the percentage of the resource’s time you want devoted to this specific task. This value will
recalculate automatically when you enter the Assigned Work Units, which is the total number of the
task’s work units to which this particular resource will be assigned. The assignment cost will be calculated as the (Per Use Cost) + (Standard Rate x Duration) + (Overtime Rate x Overtime Duration).
Assign resources to each bar in your
schedule by typing resource names
in the Assigned Resources column or
within the Assignments panel of the
Information form.