HT9022 5.3.3. Checking phase sequence and phase concordance with a lead WARNING While measuring, the instrument must be held in the operator’s hand. Mod Par Ok AC <10.0 Hz AC DC Press key F1 (Mod) to open the drop-down menu shown on the Ph Seq screen to the side. At each subsequent pressure of key F1 Help V (Mod), the cursor will scroll through the available items. Select Esc - - - “Ph Seq” and press key F4 (OK) to confirm the selected item. 19/01-17:00:00 5.3.3.1. Verification of Phase Sequence. Fig. 7: verification of phase sequence Mod Go Ph Seq 1. The instrument shows the screen here to the side, and waits for the detection of phase L1. 2. Insert the red cable into input terminal VΩ and connect the red lead to phase L1 (Fig. 7). PH1 Wait 19/01-17:00:00 1.800.561.8187 www. EN.com - 19 [email protected]