Download installation and servicing
Transcript
back SERVICING 73 USER CONTROL REPLACEMENT 1. Refer to Frame 57. 2. Loosen the screw on the underside of the user control. Ecl 2 044 Note. Only the display unit is replaced. 3. Pull the display unit forward to remove. 4. Push the new display unit into position. 5. Reassemble in reverse order. 6. Check operation of the boiler. Refer to Frame 57. Display unit SERVICING 2 74 PRESSURE GAUGE REPLACEMENT 1. Refer to Frame 57. 2. Drain the boiler. Refer to Frame 77. 3. Unscrew the pressure gauge and discard. 4. Fit the new pressure gauge, using a suitable jointing compound. 5. Refill the boiler. Refer to Frame 36. Pressure gauge Flow isolation valve (shown in the open position) 50 203319-3.pmd 2041 6. Check operation of the boiler. Refer to Frame 57. isar - Installation and Servicing 50 27/03/2008, 08:15