Download Eas-eac_uk_072015
Transcript
EAC6W: Frame Size 60 mm × 156 mm 24 VDC Input Standard Type with Shaft Guide (With cover) Maximum Transportable Mass: Horizontal 60 kg/Vertical 28 kg Stroke: 50 to 300 mm (50 mm increments) ■Motorized Cylinders Drive System Ball Screw Repetitive Positioning Accuracy [mm] EAC6W-D□□-ARAK ■-◇- ■ EAC6W-D□□-ARMK ■-◇- ■ EAC6W-E□□-ARAK ■-◇- ■ EAC6W-E□□-ARMK ■-◇- ■ Resolution[P/R] 100∼10000 Transportable Mass [kg] Horizontal Vertical − ∼30 ∼13 − ∼60 ∼28 Lead [mm] Product Name ±0.02 12 6 Dynamic Permissible Moment [N·m] Static Permissible Moment [N·m] M P:2.2 M Y :2.2 M R:1.3 M P:7.8 M Y :7.8 M R:3.0 Thrust [N] Pushing Force [N] Holding Force [N] Maximum Speed [mm/s] ∼200 400 200 600 ∼400 500 400 300 ●A number indicating the stroke length is entered where the box □ is located within the product name. A symbol indicating the driver type is specified in the box ■ in the product name. A number indicating the desired length of 1 (1 m), 2 (2 m) or 3 (3 m) is entered where the box ◇ is located within the product name when the cable is included with the product. An alphabet (G) indicating being equipped with shaft guide cover is specified in the box ■ in the product name. ●For reading the specifications table and cautions, refer to "How to Read Specifications Table" on Page 16. ●For the specifications and characteristics for 48 VDC input, contact the nearest Oriental Motor sales office. ■Positioning Distance – Positioning Time ■Maximum Transportable Mass in Horizontal Direction The positioning time (reference) can be checked from the positioning distance. Refer to page 122 for operating speed and acceleration. ●12 mm Lead ◇Horizontal Direction Installation 3.0 1.0 0.5 0 0 100 200 Positioning Distance [mm] 2.0 3.0 Load Mass 0 kg 6.5 kg 13 kg Horizontal Transferrable Mass [kg] Load Mass 0 kg 15 kg 30 kg Positioning Time [s] Positioning Time [s] ◇Positioning Distance – Horizontally Transportable Mass ◇Vertical Direction Installation 1.5 1.0 0 0 300 100 200 Positioning Distance [mm] 3.0 8.0 7.0 Positioning Time [s] Positioning Time [s] 3.5 2.5 2.0 1.5 6.0 Load Mass 0 kg 14 kg 28 kg 1.0 0 0 Home Position 450 Lead: 12 mm Lead: 6 mm 400 350 Thrust [N] 300 250 200 150 100 50 0 62 100 200 300 400 500 Operating Speed [mm/s] 600 700 Overhung distance Positioning Distance 100 200 Positioning Distance [mm] Note ●The positioning time in the graph does not include the settling time. Use a settling time of 0.15 s or less as a reference. (Settling time is adjustable by the velocity filter function.) ●The starting speed should be 6 mm/s or less. ■Operating Speed – Thrust 300 Load Center of Gravity 3.0 0.5 300 100 200 Positioning Distance [mm] 4.0 2.0 100 200 Positioning Distance [mm] 0.5 5.0 1.0 0 0 1.0 Products with shaft guide and shaft guide cover can be applied with load, and can transport the load. Refer to the above graph for the horizontally transportable mass. 9.0 Load Mass 0 kg 30 kg 60 kg 1.5 0 0 ◇Vertical Direction Installation 4.0 2.0 300 ●6 mm Lead ◇Horizontal Direction Installation Overhung distance 0 mm 50 mm 100 mm 150 mm 2.5 300 ●The positioning distance is the distance from the home position. ●The overhung distance is the distance taken by the protrusion from the load installation surface. ■Dimensions ●Motorized Cylinders ➜ Page 70