Download IS/IEC 1131-2 (1992): Programmable Controllers, Part 2: Equipment
Transcript
IS/IEC 1131-2 (1992) w A 60 s f 10 % I IA4 1-t I 60~5~10% -1 I I UC3 LJemin. SDV shutdown procedure of initiates abnormal -_-_ + t (s) Test A : Gradual shutdown / start-up test P) 5s 5s max. : 5 s min. :1s max.:5s 7’ min.:ls Ue 0.9 SD&iv. 2 lo % 1I I I t (s) Test C : Slow supply vottage variations Test B : Fast supply voltage variations IEC Figure 11 - External energy supply variation tests 6.3.7.4 Improper power supply connection tests Requirement 6.3.7.4.1 reference: item 5 of 3.2.3. Reversal of d.c. power supply polarity test (withstand test) The rated voltage of reverse polarity shall be applied for 10 s. The results shall comply with the conditions stated by the manufacturer (such as fuse blowing). After the test the basic PC-system shall pass the proper verification procedure 6.3.2.2). Protective devices such as fuses may be reset prior to verification. 6.3.7.4.2 (see improper voltage level and/or frequency test For voltage level above the maximum normal service conditions limit U, max. or/and frequencies beyond the normal service conditions limits F, max. and F,, min., the test shall be agreed between the user and the manufacturer. 96 W