GEMINI 2000 Installation Planning This guide is intended to assist the customer in selecting and preparing a site to install a Varian GEMINI 2000 Series NMR superconducting spectrometer system. By following the information presented, and by using the predelivery and postdelivery checklists provided in “Appendix A. Installation Checklists” on page 33, a smooth transition from delivery to installation will be made. Keep in mind that Varian’s delivery responsibility ends at Varian’s factory shipping dock or at the customer’s receiving dock, depending upon the type of insurance obtained by the customer. In either case, the customer must provide a moving crew to move the shipping crates holding the system from the delivery truck (or storage location) to the installation site. Certain supplies not provided by Varian, such as helium and nitrogen supplies, must be obtained by the customer before the Varian installation engineer can start the installation. This guide lists and describes these supplies in detail. We at Varian will make every effort to ensure that the ownership of your new NMR spectrometer is a lasting and pleasurable experience. If you have any questions, do not hesitate to call your local sales representative or to contact us at the following location: Varian, Inc., NMR Systems Customer Support Group 3120 Hansen Way, MS D-421 Palo Alto, CA 94304-1030 Telephone: 1-800-356-4437 Safety Precautions Throughout this guide are important warnings and cautions that you should read and follow carefully. These safety precautions have the following format and meaning: WARNING Warnings are used when failure to observe instructions or precautions could result in injury or death to humans or animals, or significant property damage. CAUTION Cautions are used when failure to observe instructions could result in permanent damage to equipment or loss of data. Installation Site Requirements Check the “SHIP BY” date on the Varian Order Acknowledgment form. Use this date as a target for completing installation preparations. If you anticipate any delays in site readiness and need to delay shipment, notify the factory at least 90 days in advance. 87-192320-00 A0894 GEMINI 2000 Installation Planning Guide 7