Download GEMINI 2000 Installation Planning Guide

Transcript
GEMINI 2000 Installation Planning
This guide is intended to assist the customer in selecting and preparing a site to install
a Varian GEMINI 2000 Series NMR superconducting spectrometer system. By
following the information presented, and by using the predelivery and postdelivery
checklists provided in “Appendix A. Installation Checklists” on page 33, a smooth
transition from delivery to installation will be made.
Keep in mind that Varian’s delivery responsibility ends at Varian’s factory shipping
dock or at the customer’s receiving dock, depending upon the type of insurance
obtained by the customer. In either case, the customer must provide a moving crew to
move the shipping crates holding the system from the delivery truck (or storage
location) to the installation site.
Certain supplies not provided by Varian, such as helium and nitrogen supplies, must be
obtained by the customer before the Varian installation engineer can start the
installation. This guide lists and describes these supplies in detail.
We at Varian will make every effort to ensure that the ownership of your new NMR
spectrometer is a lasting and pleasurable experience. If you have any questions, do not
hesitate to call your local sales representative or to contact us at the following location:
Varian, Inc., NMR Systems
Customer Support Group
3120 Hansen Way, MS D-421
Palo Alto, CA 94304-1030
Telephone: 1-800-356-4437
Safety Precautions
Throughout this guide are important warnings and cautions that you should read and
follow carefully. These safety precautions have the following format and meaning:
WARNING
Warnings are used when failure to observe instructions or precautions
could result in injury or death to humans or animals, or significant
property damage.
CAUTION
Cautions are used when failure to observe instructions could result in
permanent damage to equipment or loss of data.
Installation Site Requirements
Check the “SHIP BY” date on the Varian Order Acknowledgment form. Use this date
as a target for completing installation preparations. If you anticipate any delays in site
readiness and need to delay shipment, notify the factory at least 90 days in advance.
87-192320-00 A0894
GEMINI 2000 Installation Planning Guide
7