Download Single Wrapper Service
Transcript
Maintenance (general) Every 200 bales: •Pivot of plastic film roll support (1) •Pivot of unloading platform (4) •Central axle of turntable (1 on top) •Pivots and barrier of tilting table (3) •Plastic film cutter (3 underneath and 1 on the side) •Axles of the unloading table cylinder Every 500 bales •front and rear stabilizers (2 each) •Axles of the front stabilizer cylinders (2 each) •Tandem axles (1 each) Every 1000 bales •Bearing of the two feed rollers of the belts (1 on each end, total of 4) Lubrication schedule It si very important to remove all debris from the guards before lubrication and after wrapping each day.