Download A-Track DCC - Reference Manual - A

Transcript
A-Track Reference Manual
unsupported, you can omit these CVs from your selection in order to speed up
the overall Read/Verify operation.
The Read/Verify operation continues with the next CV following any failure.
However, when an unexpected failure does occur (or for any other reason) you can
stop the operation by clicking the Cancel button although, as noted previously, this
can take up to 20 seconds in Paged or Register Modes (regardless of how many
times you click the Cancel button).
In the example shown below, with a selected range of CV15 to CV35, Read/Verify
has failed to read the values of CV27 and CV28, and has been halted by the user in
the course of reading CV32 (for which the value shown may be incorrect), leaving
the remainder of the selection (CV33-CV35) unread –
You can carry on with the Read/Verify operation from the next selected CV by
clicking on Continue, when the Read/Verify operation will restart at CV33,
continuing up to CV35. Click Finish to terminate the Read/Verify operation.
Following a failure of the Read/Verify operation, and after checking all of the
Program Track electrical connections, and the contact between the locomotive and
the track – in case the failure was due to some temporary condition – you can
repeat the operation.
Either individually select each of the CVs where Read/Verify failed, and is indicated
by ‘strikethrough’, or select any one and then press Ctrl-L (hold down either Ctrl
(Control) key then press the L key), which will select all CVs marked by
‘strikethrough’, and then retry the Read/Verify operation with the CV Scope set at
the Selected option.
Page 119 of 303
Version 4.3.2