Download Table of Contents

Transcript
Transformer Secondary Cable
Motor Cable
Power Cable Dimensions
Comments:
Installation Conditions
Equipment Grounding
Auxiliary Power Cable
Control Cables
Cable Routing
Power Cables
Cable Termination
Cable Length
Grounding Wire
Control Cables
Mains and Motor Cable Connection Diagrams
Mechanical Installation
Required Tools and Parts
Preparation of Mounting Site
Displacement to Installation Site
Mounting the Cabinet
Electrical Installation
Mains and Motor Cable Lead-In
Inserting Mains and Motor Cables
Grounding Connections
Insulation Checks
Mains and Motor Cable Connections
Auxiliary Power Cable Connection
Control Cable Connection
Wiring Tests
Final Work
Preparation for commissioning
10-6
10-7
10-8
10-8
10-9
10-9
10-9
10-9
10-10
10-10
10-10
10-10
10-10
10-10
10-10
10-12
10-12
10-12
10-13
10-13
10-16
10-16
10-18
10-21
10-21
10-22
10-23
10-25
10-28
10-28
10-28
Chapter 11 - Commissioning
Overview
Preparation of Commissioning
General Preconditions
High Voltage Equipment
Auxiliary Voltage Supply and Control
Cooling Circuit
Miscellaneous
Commissioning Procedure
Required Customer Manpower
Acceptance
Warranty
8 (of 10)
3BHS102769
11-1
11-1
11-1
11-1
11-1
11-1
11-2
11-2
11-2
11-2
11-2
ACS 1000 User’s Manual, Rev. C