7.6. SYSTEM TEST
Testing done by
Date
Responsible
Test name
Requirements tested
ST–40
Start SPLight.
ST–41
Make a new project
and insert a new diagram and a new component. Try all the
functions in the Edit
menu.
ST–42
Make a diagram with
more than ten connected components
and add advanced
functions
to
the
complexity matrices.
ST–43
Try all menu functions.
ST–44
Try all functions in
the main window.
ST–45
Try all functions in
the component window.
ST–46
Try all functions in
the main connector
window.
ST–47
Table 7.12:
143
Christian L
21–11–2005
Erik D
Genaral GUI
F–11, F–13, F–14, F–74 through F–83
Icons shall look like those in standard MS OK
Windows software. The main menu shall
have File, Edit and Help as first level
menus.
It shall be possible to copy, paste and cut diagram objects. It shall be possible to undo
20 operations. It shall be possible to zoom
in and out on the diagram.
NOT
OK
(See
7.6.3)
Mouse cursor shall turn into an hourglass NOT
while computing. A progress bar shall OK
show the progress.
(See
7.6.3)
Every function displaying a dialog box OK
shall be possible to abort by pressing "Cancel".
Every function displaying a dialog box OK
shall be possible to abort by pressing "Cancel".
Every function displaying a dialog box OK
shall be possible to abort by pressing "Cancel".
Every function displaying a dialog box OK
shall be possible to abort by pressing "Cancel".
Rule check test (continued on next page)