Download Operator/Owner Materials-ControLinks Software
Transcript
ZM7999 CONTROLINKS™ SOFTWARE CONFIGURATION TOOL BEFORE YOU BEGIN THE COMMISSIONING PROCESS Before you begin to commission a system: Commissioning a burner using the ZM7999 ControLinks™ Software Configuration Tool requires the following general steps: 1. Connecting the R7999 to the communications port of your PC, and logging onto the software with a password. This prevents unauthorized users from modifying the modulation curve. 2. Specifying the base configuration: one or two fuels, with or without FGR. 3. Selecting system parameters such as Low Fire Hold. 4. Specifying the characteristics of the actuators and setting the valve/damper end points for those actuators. 5. Creating a modulation curve (profile) for each fuel and verifying it from maximum to minimum modulation. (While you are commissioning the system, you must monitor the burner operation with appropriate safety instrumentation to verify the modulation curve.) Refer to “Creating an Air/Fuel Ratio Curve - Example” for a detailed example of how a system should be commissioned. 1. 2. Read this guide to understand how the program operates. Review the “Commissioning Process” and “Creating an Air/Fuel Ratio Profile - Example” sections so that you have a clear understanding of the commissioning process. STARTING THE PROGRAM To start the program, proceed as follows: Double-click the “FuelAir ZM7999” icon on your desktop. OR 1. 2. 3. Press the Windows Start button. Select “Fuel Air Wizard ZM7999.” Select “FuelAir ZM7999.” Commissioning Overview The following table provides a step-by-step overview of how a system is commissioned. A detailed example of how to commission a system is described in “Creating an Air/Fuel Ratio Curve—Example”. The Notes column in the table provide references to detailed information when completing the more complex operations. Table 1. Commissioning Overview. Step Action 1 On the Intro screen, press Commission. 2 On the Connect to Fuel/Air Controller screen, perform the following steps: 2.a. Enter your password. 2.b. 2.c. 3 3.a. 3.b. 4 4.a. 4.b. Select or verify the communications port to which the R7999 is connected. Press Next button. On the Select Base Configuration screen, perform the following steps: Select the base configuration. Select an actuator to configure: Air, Fuel 1, Fuel 2, or FGR. On the Set Actuator Endpoints screen, perform the following steps: Select the Direction of Closed Travel: Clockwise or Counterclockwise. Select the Actuator’s Valve or Damper Type: Fixed Stops or Continuous Rotation. 5 Notes The ZM7999 requires you to enter your own password. The factory default password is “password.” The choices are: • Unconfigured: selecting this option takes the device back to a factory state. • Single Fuel • Single Fuel with FGR • Dual Fuel • Dual Fuel with FGR There may not be a button for each actuator. 65-0242—2