Download Neutron Engineering Inc.
Transcript
Neutron Engineering Inc. Table of Contents Page 1 . CERTIFICATION 4 2 . SUMMARY OF TEST RESULTS 5 2.1 TEST FACILITY 6 2.2 MEASUREMENT UNCERTAINTY 6 3 . GENERAL INFORMATION 7 3.1 GENERAL DESCRIPTION OF EUT 7 3.2 DESCRIPTION OF TEST MODES 8 3.3 BLOCK DIGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 9 3.4 DESCRIPTION OF SUPPORT UNITS 4 . EMC EMISSION TEST 10 11 4.1 CONDUCTED EMISSION MEASUREMENT 4.1.1 POWER LINE CONDUCTED EMISSION 4.1.2 MEASUREMENT INSTRUMENTS LIST 4.1.3 TEST PROCEDURE 4.1.4 DEVIATION FROM TEST STANDARD 4.1.5 TEST SETUP 4.1.6 EUT OPERATING CONDITIONS 4.1.7 TEST RESULTS 11 11 11 12 12 12 13 14 4.2 RADIATED EMISSION MEASUREMENT 4.2.1 LIMITS OF RADIATED EMISSION MEASUREMENT 4.2.2 MEASUREMENT INSTRUMENTS LIST 4.2.3 TEST PROCEDURE 4.2.4 DEVIATION FROM TEST STANDARD 4.2.5 TEST SETUP 4.2.6 EUT OPERATING CONDITIONS 4.2.7 TEST RESULTS-BETWEEN 30MHZ AND 1000MHZ 4.2.8 TEST RESULTS-ABOVE 1000MHZ 18 18 19 19 19 20 20 21 25 5 . EUT TEST PHOTO Report No.: NEI-FCCE-1-E0712010 29 Page 3 of 32