Download Appendix H Load characteristics for EIB powerline

Transcript
2.4
2.4.1
Contents
Planning
Establishing the customer requirements in
functional buildings
Establishing customer requirements in
residential buildings
28
28
2.5
2.5.1
2.5.2
2.5.3
2.5.4
2.5.5
2.5.6
Project design
Bus devices and installation material
Planning the bus devices
Protection against lightning and overvoltage
Functional security
Address allocation and design lists
Documentation
42
42
51
61
68
70
75
2.6
2.6.1
2.6.2
2.6.3
2.6.4
2.6.5
Electrical installation
Intersections and adjacency
Laying the bus line
Preparatory work in the distribution panels
Checking the line network
Identifying, installing and connecting the bus
devices
Earthing and potential equalisation
Test log
75
76
79
82
82
84
Commissioning
Loading the physical address
Loading the application programs with group
addresses and parameters
Loading the filter tables
Programming the line couplers and area
couplers
Advice on the preferred procedure
Partial commissioning
Function tests, official acceptance and
documentation
89
89
89
Extending existing EIB installations
92
2.4.2
1
Introduction
1
2
Transmission via bus lines
5
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.1.9
System description
Tasks of building systems engineering
Topology
Transmission technology
Bus access
Telegram layout and addressing
Layout of the bus devices
Installation
Electrical safety
System and supply reliability
5
5
6
11
11
12
13
14
15
16
2.2
2.2.1
2.2.2
Typical applications
Controlling lights, shutters and blinds
Single room temperature control, heating and
ventilation control
Load management
Monitoring, displaying, reporting and
operating
19
19
20
2.2.3
2.2.4
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.3.5
2.3.6
Communication with other systems
Data interface
Appliance interface
Interface to communications networks
Interface between EIB transmission media
Interface to the building systems automation
Interfaces to infrared (IR) control systems
21
21
23
23
23
25
26
26
27
2.6.6
2.6.7
2.7
2.7.1
2.7.2
2.7.3
2.7.4
2.7.5
2.7.6
2.7.7
2.8
IV
33
87
87
89
90
90
90
91
V