Download GREENSTAR CDi CLASSIC REGULAR
Transcript
INSTALLATION 1. The mains supply to the boiler must be fed through a fused double pole isolator situated adjacent to the appliance. The isolator must have a contact separation of 3 mm minimum in all poles. B 2. 8. External Pump (ST2): ▶ Connect NEUTRAL wire to terminal (Nz) ▶ Connect LIVE wire to terminal (Lz) ▶ Connect EARTH wire to earth bracket (E) C 3. 4. The system pump must be connected to the appliance control for the pump over-run facility. 5. D EARTH = LIVE = D NEUTRAL = E 7. 6. 230V E N ▶ Refit panel and secure with screws (B). ▶ Bring the control panel to its upper position and secure by sliding the white plastic clip up. N SWITCHED LIVE = L 9. Refit control panel cover: S 3. EXTERNAL CONTROLS WIRING CENTRE L 8. L L R LS N S N D 5. EXTERNAL PUMP ST10 L R L S NS N 4. D S L N ST10 C L LZ NZ ST2 N L E ST19 LZ NZ ST2 FR FS NP LP LR LS NS N ST8 L 9 ST6 ST10 B B 4 2 1 A F 8 7 ST19 T2.5A LZ NZ ST2 FR FS NP LP LR LS NS N ST8 L 9 ST6 ST10 B B 4 2 1 A F 8 Code Plug Fig. 37 Control panel access CAUTION: Isolate the mains gas supply before starting any work and observe all relevant safety precautions. 6720648547-15.2Wo T2.5A 6720648547-43.2Wo 7 Code Plug Fig. 38 Electrical connections CAUTION: Short circuit ▶ When connecting the cables ensure that no cable strands fall into the Heatronic. 6 720 806 548 (2013/02) 25