Download Edge Performance Chips Installation Instruction
Transcript
Dodge 5.7L Hemi Evolution Run the cable inside of the access panel. Figure #3 3. Route the cable up along the door seal, and along the bottom of the A-Pillar (shown in Figure #4). Approximately 8 to 10 inches of cable must be available to pass under and through the dash pod. Route cable along door seal, and along the bottom of the A-Pillar Figure #4 4. Install the Evolution pod, according to the pod installation instructions. Make sure the connector and approximately 4 inchs of the cable extend out of the inside of the pod before securing the pod to the dashboard as shown in Figure #5. - 12 -