Waste cycle trials
Table A12 Manual system – bags
Time
13 minutes
Time multiplied by four for laboratories
52 minutes
Labour (no. of people)
4
Volume of British Gypsum bag
1 m3
Weight*
248 kg
Volume of plasterboard
0.349 m3
Percentage plasterboard
35%
Time taken
0.867 hours
Time taken per m3
3
Cost per m
2.48 hours
£20.15
* Measured by weighbridge
Table A13 Chipper system – bags
Time
23 minutes
Labour (no. of people)
1
Volume of British Gypsum bag
1 m3
Weight*
342 kg
Volume of plasterboard
0.482 m3
Percentage plasterboard
48.2%
Time taken
0.383 hours
Time taken per m3
3
Cost per m
0.80 hours
£6.462
* NB Not wet
Table A14 Chipper system – skip
Time
71 minutes
Time multiplied by two for laboratories
142 minutes
Labour
2
Size of skip
8 cu. yd = 6.116 m3
Weight*
2,200 kg
Volume of plasterboard in skip
3.099 m3
Percentage of plasterboard in skip
50.664%
Time taken
2.367 hours
Time taken per m3
0.764 hours
Cost per m3
£6.20
* NB Not wet
Capture of waste plasterboard on construction sites 67