Download Data Centre for High Performance Computing
Transcript
(v) Preparation of Package Design including Single Line Diagrams with Design data and typical installation detailing to specific equipments to clarify and guide the overall work package to its equipment level. (vi) DCTP shall review the building infrastructure availability and recommend necessary suggestion & features incorporation in the design to meet overall DC design requirements. (vii) Schematic diagrams for various sub-systems. (viii) Preparation of working drawings for the complete DC facilities. (ix) Provide all technical assistance related to electrical liaising work. (x) DCTP to provide self approved schedule of Quantities/ Bill of material to IITM which should be as per IITM approved design drawings documents. (xi) Integrate architectural & engineering features related to Data Centre in accordance with established design criterion (xii) Site Infrastructure Requirement / Report (xiii) Preparing Data Centre Coordinated Layout Deliverables DCTP shall submit the following deliverables:(i) Coordinated Design Drawings (ii) Coordinated Data Centre Layout document for all the work/Sub-Work Packages services (iii) Schedule of quantities/Bill of material document for all Work/Sub-Work Packages (iv) Product Specification Document for all Work/Sub Work Packages (v) Product Make/Model with Capacity sizing calculation document for all work/Sub-Work packages (vi) Electrical SLD (up to Rack Level), Schematics, equipment design drawing document (vii) Breakers tripping end to end coordination design and scheme (viii) Air-conditioning cooling solution design (ix) Air-conditioning solution Schematic and drawing documents (x) Safety & Security and Building Management Schematic and drawings (xii) Civil- DC architectural layout, Floor Loading Details, DC elevation and Sectional Drawing (xiii) BMS Data Point summary document All the above mentioned deliverables is applicable for each Work packages/Sub-Work Packages and document shall be submitted as each package wise. Completion Criteria Submission of the above listed deliverables and respective approval IITM project In charge or his designated representative constitutes the completion of this activity. Completion Timelines The activity should be completed before 100 days after signing the contract. Material Ordering and Pre-Dispatch Inspection Scope of Services This shall comprise of IITM’s HPC DATA CENTER RFP Page 57 of 572
Related documents
VIA30P Installation Instructions
Liebert® eXL™ Uninterruptible Power System
manual técnico de aplicações sanitárias e de aquecimento
DIVISION 16 - ELECTRICAL PAGES Section 16000: Electrical
Tender Document
SDI7984P16
Anexo XVII- LOTE 01
HOME - INSPECTION sarl Rapport d`Inspection PRÉ
ARIA ITALIANO
GPPC - GSPC
608DA07_relazione elettrica R01
TLB 425T User Manual/IFU