Download View - Net
Transcript
D 00 Safety instruction related to maintenance During pump removal, operator could be in contact with process residues on the exhaust which could cause severe injury or death. Ask your safety department for instructions according to the local statements. Recommandations (P and H versions) Purge the installation with dry nitrogen. The flush is performed automatically when the pump is stopped (normal stop, or due to a fault) if a maintained level of purge gas has been programmed. Otherwise, proceed as follows: – If the pump is remote controlled, remove the connections on J14 and J1 connectors, at the rear of the pump, and connect the cover plug connectors (supplied with the machine) instead. – Adjust the parameter “PURGE FLOW PROLONGED” for a period of 10 minutes and program the PURGE COMMAND on ENABLED. – Press START and then STOP on the front panel: the gas purge takes place during the “STOP IN PROGRESS”. Wear gloves, protective glasses and, if necessary, a breathing mask. Ventilate the premises well. Unsuffisant tightness after servicing could result in chemical hazards. Always perform a leak test after maintenance. How to contact us The partial and full overhaul must be performed by manufacturer’s trained personnel. Contact nearest service center or the service support at the following e-mail address: [email protected] 2/2 adixen Vacuum Products - Operating instructions - ADP/ADS Series Two G 01081 - Edition 07 - January 10 Do not dispose of residue, if necessary, have it destroyed by a qualified organization.