Download FMECA Volume 4: Mechanical Components
Transcript
Open Publication Revision History Revision Date A 11 th Nov 2006 B6 P P th 14 Feb 2009 P P Description Document assembled from other files 3 rd Jan 2007Update based on test results. Clarified Method. B2: Results from HAZOP reviews held in Jan 07 added 16 th Feb 2007. B3 is addition of only in Feb 2007. B4 on 28 th May added consideration of water dumps and review of all previous actions, following manned trials. B5 on 26 th Oct 2008 updated water dump decision based on feedback from training managers. B6 on 14 th Feb 2009, updating ALVBOV P P P P XFig 4-30X P P P P P P B7 22th May 2009 Intermediate pressure over-pressure effects considered in more detail, and section on Over-pressure valves added. B8 23rd Aug 2009 Updated with ALVBOV seal failures, manual oxygen dosing unit failures, and flapper web failures. B9 5th Dec 2009 Material MSDS references updated B10 31st Jul 2010 Sections 4.4, 4.10, 4.16 and 4.27 Updated. Sections 4.17 and 4.30 added. Clarification of flapper valve reverse pressure requirement. B11 21st Aug 2014 Added further detail to flapper valves and also new water dump design, Sections 4.10 and 4.14. Changes in 2013 Version of EN 14143 considered: no change found to be required other than as minor update to Section 2. FMECA_OR_V4_140831.doc Rev B11 Page 2 of 104