Download Power Generation Facilities
Transcript
VESDA by Xtralis Power Generation Facilities Design Guide (a) Ceiling dropdown pipes (b) Vertical pipe orientation Figure 14 – Options for multi-level protection. A fire risk assessment of the environment will determine the likely stratification layer height. Sampling holes must be located within the stratification layer. Important Note: Doc. 14158_02 Local codes and standards should be consulted to determine the permissible length of dropdown pipes or sampling hole height (Figure 14). 15