Lighting Global Quality Assurance Protocols 3.0
X.4.1.1
191
Equipment requirements
• Tape measure or ruler at least 1 m in length
• Camera
X.4.1.2
Test prerequisites
At the start of the drop test the DUT samples should be minimally altered (ideally unaltered), fully
functional, and have sufficient charge to check for functionality throughout the test.
If the DUT samples have multiple units or components, determine an appropriate order to test the
parts need to undergo the drop test. DUT samples or sample parts that are intended to be stationary
(e.g., separate control boxes, lamp units intended to be mounted, etc.) and PV modules do not need to
be drop-tested. Portable DUT samples or sample parts (e.g., torches, lanterns, desktop lamps, etc.)
should be drop tested.
NOTE
This test is destructive. Do not carry out additional tests with the tested samples.
X.4.1.3
Apparatus
Choose an appropriate location to perform the drop test. The location should have a smooth, level
concrete surface with ample space to avoid personal injury from a DUT projectile (e.g., glass and/or
plastic shards). A height of 1 m must be established from the ground to begin the drop.
X.4.1.4
Procedure
a) Drop the DUT sample six times from a height of 1 m—once on each of the six “faces” of the
product, taking care to drop the DUT sample on parts deemed mechanically weak (e.g., handles,
loose parts, etc.).
NOTE Each time the product should impact the concrete on a different face: the DUT sample is rotated by 90° along the x-axis following each of the
first three drops, rotated by 90° along the y-axis from its initial drop orientation for the fifth drop, and rotated 180° along the y-axis from its fifth
drop orientation for the sixth drop (see Figure X.1 below).
Figure X.1 – Three-dimensional Cartesian coordinate system for drop test reference
Lighting Global Quality Assurance