5.2 AC Grid Connection: 3-Phase+PE or 3-Phase+N+PE WARNING! Death and serious injuries may occur. Before AC wiring, please ensure AC breaker is switched off. 5.2.1 Required Protective Devices and Cable Cross-sections It is recommended to install upstream circuit breakers between AC side and inverter side for over current protection. Table 5-1 Recommended upstream protection Model Upstream circuit breaker RPI-M8 20A RPI-M10 20A RPI-M12 30A RPI-M15 30A RPI-M15A 30A RPI-M20 40A RPI-M20A 40A RPI-M30 60A L3 L2 L1 N To solar inverter AC plug PE G N L1 L2 L3 The AC cable must be jacked and meet the specification in table 5-2. Table 5-2 Wire size of AC input Model Current Rating Wire size Torque Temperature 40 A 5 - 8 mm2 0.7 N m Meet UL 10070 60 A 10 mm2 or 6 AWG 3Nm Meet UL 10070 RPI-M8 RPI-M10 RPI-M12 RPI-M15 RPI-M15A RPI-M20 RPI-M20A RPI-M30 20