Download Technical Manual
Transcript
p 3/51 Table of Contents 1. SAFETY WARNINGS 4 2. DESCRIPTION 5 2.1. Locating Components 2.2. Operating Principle 2.3. Control Board 5 7 8 3. INSTALLATION 26 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 26 27 28 31 32 33 Preparing the Base Plate Placing the Equipment Conversion From One Solution To Another Installation of a Round Arm Installation of the Tip Support Electrical Connections 4. ADJUSTMENTS 34 4.1. 4.2. 4.3. 4.4. 34 35 38 39 Positioning of the levers on the Shaft Balancing of the Boom Arm by means of the Spring Levelling of the Boom Arm Adjusting the Limit Switches (Microswitches) 5. USE 40 5.1. 5.2. 5.3. 5.4. Commissioning Maintenance Breakdowns and Remedies Prolonged Stoppage / Destruction 40 40 41 41 6. TECHNICAL SPECIFICATIONS 42 7. DIMENSIONS 43 8. INSTALLATION DRAWINGS 44 9. ELECTRICAL DIAGRAMS 46 9.1. Control blocks assignment 47 10. "EC" CERTIFICATE OF CONFORMITY 50 Technical Manual BL229 -MT-EN The informat ion in th is document is the property of Automat ic Systems and is confident ial. The consignee withholds f rom using it for anyth ing other than the use of the products or the execut ion of the project to wh ich they belong and withholds fr om communicat ing it to th ird part ies without pr ior wr it ten agreement from Automatic Systems . Document subject to change without pr ior not ice.