Download Field Problems Reported at Workshop on C
Transcript
Name of the Site/Circle : Tamil Nadu S.No. Problem Detail Solution/Comments 1. In a multi module type CDOT switch during A/T of line-to-line call between two RSUs one sub in on RSU to sub in the other RSU it was observed that there was no speech condition in a cyclic fashion (perhaps every 28). It was solved in the subsequent patch by blocking some specific time slots for voice calls. Whether in the new version the above time slot is made available for all type of calls The problem was solved from s/w 4.26 own ward and now all the slots are available for speech. 2. The switch should be designed in such a way that there should not be any limitation for equipping RSU BM. (i.e.) to say that in a multi Module-XL type switch all the 32 BMs can be configured as remote BMs. This requirement has been taken care in new H/W design of VECM & BM. 3. In the present x-code modification utility there are some problems. To quote a few that if there is any hot line equipped in a particular BM that level cannot be modified. Those numbers under frozen status the meter reading becomes zero after modification of the X-code. − Caution regarding withdrawal of Hot line/call diversion facility has been mentioned in X-code Modification procedure − Meter reading problem of frozen Nos. will be taken care in subsequent S/W Release. 4. Utility should be developed to sort numbers according to subscribers priority, and for changing the BM number. This is a field requirement to release the co-located even BMs for creating new remote BMs. Requirement is under consideration. 5. Among the switches working in the Indian net work it is seen that the C-DOT type of switches are the most affected one against lightning, even after taking all known precautionary steps to avoid such heavy discharge that may occur during the period of lightning Secondary protection has been provided in the newly designed LCC Card of 16 port. This card will be available with new H/W of VE-BM/CM. 6. A fool proof tool for testing of the switch for its BHCA capacity should be made available as part of the software, as unavailability of sufficient number of LTG and its reliability because of its wear and tear poses problems to the installer. The present restriction of changing the system parameter SPL-RNG during the testing in a working exchange does not seem to be a workable one. In addition the tool should be similar to the one that of the present LTG (such as with the option of number of calls to be generated, specifying CTS-B tool is the only solution available at present. -5-