Verify the Power Node synchronization with three Sensor
Nodes.
Connect three sensor nodes instead of only one.
Expected
result
Positive test
Verify on packet sniffer application interface, the exchange of
messages between Power node and all Sensor Nodes that proves the
synchronization between them.
Input data
Start level for Knopflerfish container – 9
Desired SPD level for pSHIELD android application – 1, 2, 3, 4 or 5
stars
Procedure
The procedure is the same as the test [CS]-T01.
Output
The output should be similar to test [CS]-T01 output. However, instead
of only a pair of messages, for four nodes it gives three pairs.