Download Technical Protocols for Processing, Sputtering and RF Measuring of
Transcript
22 High Pressure Water Rinsing 3.2.5 End the process • Prepare a large beaker with two centimeters of water in. It must have a diameter higher than the cavity flange. • Switch off the compressor with the red button • Close the the valve on the wall water pipe. • Disconnect the nitrogen gas line and close the hole on the flange. • Go to the deionized water box outside the laboratories and switch off the compressor • Close the valve on the outlet connection of the compressor. • Open the two valves outside the deionized water box to empty the pipe that connect the compressor to the HPWR system. • Back to the chemistry lab. • Press the "Stop" button on the computer software. • Press "Zero" and wait the bar going back to the lowest position. • Unscrew the bottom flange of the cavity. • To avoid that particles enter in the cavity during transportation to the clean room set the cavity bottom flange in the beaker. • Switch off the cap rotation and the main switch of the HPWR system. • Cover the HPWR flange with a cap. • Disconnect the cable from the MPR control.