6. CONTROLLER TYPE: 6.1. TWO CAR GROOP CONTROLLER (WITHOUT DISPATCHER): A main switch is required for each controller. There is no need for a separate power supply for the group itself. There is a PLC in each controller; as soon as the two PLC’s are connected together through their RS232 port or the CanBus network, they automatically become a group and start dispatching hall calls to one another. If the communication link is broken, they start working as two separate controllers. Therefore, you do not have to connect both controllers together during building construction. That type of controller provides continuous dispatch back up service. This means that as soon as one of the controllers is turned off, looses power, or becomes in trouble, the other one takes over all hall calls without clearing any of them. Two car group (duplex) connection: You must connect to both controllers: The common supply to the group: +GR, COM; The entire hall calls: BU, 2U, 3U, etc.2D, 3D, etc.; Phase 1 fire services, if there are any: RFP, TSTP, TSTD, FS, ALT, FMR, FH, INCG; Emergency generator services if there is:GEN1, GEN2, LAU, UG1, UG2, A1M; After that, connect both PLCs together with the communication port RS232 by using the cable supplied with the controllers or with the CanBus network (CH1,CL1,RET1 et SHD) CONTROLLER #1 BU, 2U, 3U, ETC. 2D, 3D, 4D, ETC. RFP, TSTP, TSTD, FS, ALT, FMR, FH, INCG GEN1, GEN2, LAU, UG1, UG2, A1M +GR, COM COMMUNICATION RS232 or CanBus (CH1,CL1, RET1 et SHD) CONTROLLER #2 Since each controller has its own CPU, if some changes are made to a timer or to a programmed function described at chapter 12, they must be made in both controllers. 6.2. GOUP CONTROLLER (WITH DISPATCHER): A main switch is required for each controller: #1, #2, #3, etc. A separate 120VAC power supply is required for the dispatcher. 6-1