Download USER`S MANUAL

Transcript
6. CONTROLLER TYPE:
6.1.
TWO CAR GROOP CONTROLLER (WITHOUT DISPATCHER):
A main switch is required for each controller. There is no need for a separate power supply for
the group itself.
There is a PLC in each controller; as soon as the two PLC’s are connected together through their
RS232 port or the CanBus network, they automatically become a group and start dispatching hall
calls to one another. If the communication link is broken, they start working as two separate
controllers. Therefore, you do not have to connect both controllers together during building
construction.
That type of controller provides continuous dispatch back up service. This means that as soon as
one of the controllers is turned off, looses power, or becomes in trouble, the other one takes over
all hall calls without clearing any of them.
Two car group (duplex) connection:
You must connect to both controllers:
 The common supply to the group: +GR, COM;
 The entire hall calls: BU, 2U, 3U, etc.2D, 3D, etc.;
 Phase 1 fire services, if there are any: RFP, TSTP, TSTD, FS, ALT, FMR, FH, INCG;
 Emergency generator services if there is:GEN1, GEN2, LAU, UG1, UG2, A1M;
 After that, connect both PLCs together with the communication port RS232 by using the cable
supplied with the controllers or with the CanBus network (CH1,CL1,RET1 et SHD)
CONTROLLER
#1
BU, 2U, 3U, ETC.
2D, 3D, 4D, ETC.
RFP, TSTP, TSTD, FS, ALT, FMR, FH, INCG
GEN1, GEN2, LAU, UG1, UG2, A1M
+GR, COM
COMMUNICATION RS232 or
CanBus (CH1,CL1, RET1 et SHD)
CONTROLLER
#2
Since each controller has its own CPU, if some changes are made to a timer or to a
programmed function described at chapter 12, they must be made in both controllers.
6.2.
GOUP CONTROLLER (WITH DISPATCHER):
A main switch is required for each controller: #1, #2, #3, etc. A separate 120VAC power supply
is required for the dispatcher.
6-1