Download Guidelines for Complying with BPI`s Technical Standards for the Air

Transcript
 Foreword This guide provides information on how to comply with BPI’s Technical Standards for the Air Conditioning and Heat Pump Professional and is intended to compliment the Field Checklist provided in the Appendix. It is intended for both HVAC technicians and Third Party Verifiers. This guide follows the same numbering and order of BPI’s standard as does the Field Checklist. One form should be used for each HVAC system in the home. Where different, requirements of the “Home Performance Specifications for Warm Climates” (HPS) take precedence over the BPI requirements. These changes from HHPPSS
BPI have been noted in the manual with the following symbol: Information contained herein applies to residential buildings 3 stories or less in height. Sample forms, equipment lists and checklists are located in the Appendix and are also available in electronic format This work was originally compiled for the Clark County Community Resources Management Division in Las Vegas, NV. Examples and some requirements have been geared toward that climate. Written by: Lois B. Arena Steven Winter Associates, Inc. 50 Washington Street Norwalk, CT 06854 P: (203) 857‐0200 F: (203) 852‐0741 Disclaimer This report was prepared as a result of work sponsored by the Building America program from the U.S. Department of Energy (DOE). It does not necessarily represent the views of the DOE, or its employees. The DOE and its employees make no warranty, expressed or implied, and assume no legal liability for the information in this report; nor does any party represent that the use of this information will not infringe upon privately owned rights. This report has not been approved or disapproved by the DOE nor has the DOE passed upon the accuracy or adequacy of the information in this report.
© 2010 Steven Winter Associates, Inc. All rights reserved. Page ii