Download User Manual

Transcript
To install the rail kit:
1.
Assemble the left and right rails to the rear rails as shown in
Figure4.Do not tighten the screws.
Adjust each rail size for the depth of your rack.
Figure4 Securing the Rails
2.
3.
4.
Select the proper size in the rack for positioning the UPS (see
Figure 5). The rail occupy four positions on the front and rear of
the rack.
Tighten four M5 Unbrella Nuts in the side of rail assembly (see
Figure 4).
Secure one rail assembly to the front of the rack with one M5×12
pan-head screw and one M5 cage nut. Using two M5 cage nuts
and two M5×12 pan-head screws, attach the rail assembly to the
rear of the rack.
12