Download Instructions Installation Commissioning
Transcript
Assure each adapter is pushed to the base of the bushing. F The three extension connectors in position. F F F F The three adapters in position. Link together the three earthing braids. Position the cable ends as shown above. F F Firmly push each extension connector onto its bushing contact. Fix and tighten the braids using 1 x H M8x20 screw + flat washer + locking washer + nut. Preparation of the extension unit Remove the three white plastic covers. F 9.8 Switchboard assembly The pins (8) are used to guide the insulated tubes and ensure the holes are lined up to bolt together the upper section of the switch‐ board. 24 F Clean inside the three bushings with a cleaning cloth (2). F Put on the glove (3) and apply a thin coating of grease (5) to the insides of the bushings.