Download "user manual"

Transcript
Sectioon III – Schedule of Reequirementss
5
Insspection
ns and Tests
T
The followiing inspectioons and tests shall be perfformed:

Thee Vendor shaall get the Gooods inspecteed in the mannufacturer’s works by a competent
c
auuthority and
subbmit a test cerrtificate and also a guaraantee/warrantty certificate that the Goo
ods conform to laid
dow
wn specificattions.

UN
NOPS Logistiic Officer wiill test any orr all item of the
t Goods too confirm theeir conformitty to the
Conntract, prior to
t dispatch from
fr
the mannufacturer’s premises.
p
Suuch inspection
n and clearannce will not
prejjudice the rigght of the connsignee to in
nspect and test the Goodss on receipt at
a destinationn.

If thhe Goods faiil to meet thee laid down specifications
s
s, the supplieer shall take immediate steps to
rem
medy the defiiciency or repplace the deffective Goodds to the satissfaction of th
he Purchaser..
ITB No. UNOP
PS/JMPC/0008
80256/ITB/20133/003
Page 40 of 50
0