Download 21209885B
Transcript
S ECTION 2 SETUP AND INSTALLATION 7. Select a location on the pump tubing to install the vacuum gauge. It should allow the gauge to be easily monitored (Thermo Scientific suggests a location about half a meter from where the tubing is installed in the pump connection on the back of the unit.) Cut the tubing and install the two ends into the quick-connect fittings on the vacuum gauge. 8. From the 10m length of tubing for the bypass line, cut a piece of tubing long enough to reach from the water trap filter to the bypass filter on the back of the 1405 unit (Figure 2-21 and 2-23). Install the tubing into the quick-connect fittings on the water trap filter and bypass filter. Note. The bypass tubing will be connected to the bypass connection on the flow splitter and to the water trap when you assemble and install the sample inlet on top of the enclosure later in this section. ▲ 9. Ensure that the sample tube is properly installed in the flow splitter (refer to “Adjusting the Flow Splitter” earlier in this section). 10. Install the sample tube from the flow splitter through the roof opening (Figures 2-24 and 2-25). Note. Cap the extra opening in the enclosure roof. ▲ Figure 2-24 (left). Sample connections inside enclosure. Figure 2-25 (right). Sample connections on top of the enclosure. Sample tube Bypass tubing THERMO FISHER SCIENTIFIC OPERATING GUIDE, TEOM 1405-F 2-21
Related documents
Téléchargez le bilan financier
Bedienungsanleitung
DaqPRO manual - PCE Instruments
Imprimantes et impression Guide de l`utilisateur
distributeur engrais traines.
Report 2 - CSA Group
21209885B
Vista VIP Kit2 VK2-ENCODER User manual
AIX 5L Imprimantes et impression - Support On Line
LSLEXUS 2012 - Club Lexus France
AutoControl Instructions
Enigma video processor User manual